Saltos del Navia's location in Asturias | Empresa

Saltos del Navia's location in Asturias

57926_48656_1.jpg
The headquarters of SALTOS DEL NAVIA, C.B. are in Oviedo with some offices in the building headquarters of HC Energía:

Plaza de la Gesta, nº 2
33007 Oviedo (Asturias)


Ver mapa más grande

The Salime Hydroelectric Power Plant is located on the River Navia in the southwest of the Principado de Asturias, coinciding with the towns of Allande, Grandas de Salime and Pesoz. The nearest town is Grandas de Salime, the capital of the municipality of the same name and located about 6.5 km southwest of the dam along the regional road AS-14. This road crosses the River Navia to the crown of the dam. From the left side and through a tunnel, you reach the power plant, via a private road.

The company also has several facilities in Grandas de Salime, such as housing for the staff, warehouses, offices and the so-called Casa de Dirección, a unique building built in the same years as Salime, and whose design and direction was the work of the well-known architect, painter and sculptor Joaquín Vaquero Palacios.


Ver mapa más grande